Vinyl Swimming Pool Construction Process

Backyard Vinyl Swimming Pool Construction Step

Many homeowners worry about how the construction process will affect their homes and their lives. To ease your mind, we’ve assembled a step-by-step outline to help you know what to expect. View the steps below.

  • step1
  • STEP # 1… DIG

    The pool is painted on the ground for customer’s approval. The pool is excavated to the desired size and shape.

  • step2
  • STEP # 2… SET FORMS

    Precision aluminum forms are set in place to create the pool size and shape.

  • step3
  • STEP # 3 … POUR WALLS

    Pool walls are poured with self consolidating high strength concrete mix

  • step4
  • STEP # 4 … PLUMB POOL

    Aluminum forms are removed.
    Pool is then plumbed with 2” SCH 40 PVC pipe.
    Vermiculite/cement pool mixture is troweled onto the pool floor.

  • step5
  • STEP # 5 … BACKFILL AND POUR DECK

    The excavation around the pool is now backfilled. Pool coping is put into place and the pool deck is completed.

  • step6
  • STEP # 6 … SET EQUIPMENT AND INSTALL LINER

    Install and connect pool filtration and cleaning equipment. Install custom liner to complete the interior surface. Fill swimming pool with water.